A practical FAQ on AI-assisted corrosion assessment, responsibility, data handling and deployment value.
The full source FAQ is currently published in Traditional Chinese. Safety, regulatory and contractual matters remain subject to the project agreement and qualified professionals.
24 questions shown
The value of the system lies in rapidly screening large volumes of images, marking areas of concern, and prioritizing severity so that experienced personnel can focus their time where judgment is truly needed. Various image conditions, materials, and corrosion types can affect results; therefore, the workflow preserves images, assessment processes, and result records for review and traceability by engineering personnel.
Reports provide more than just a single grade; they present corrosion heatmap prompts on the image, corresponding environmental or classification references, and risk priorities. Users can directly compare these with the original images to check if the assessment is reasonable. If on-site information is insufficient, photos should be retaken or submitted for review by engineering personnel rather than treating a single score as the final conclusion.
Shooting distance, angle, lighting, obstructions, and image clarity all affect the quality of comparison. We recommend fixing the shooting position or asset number, recording the time and environmental information, and retaking photos of insufficient quality based on screen prompts. The platform focuses on establishing a traceable inspection process, providing a consistent basis for comparison across different batches of images.
Analysis results should serve as a basis for maintenance prioritization, inspection assistance, and communication. Final decisions involving safety, downtime, repair, or acceptance must still be made by qualified engineering, inspection, or management personnel based on on-site conditions and applicable regulations. The system retains input images and assessment records to help teams reconstruct the decision-making context.
The platform presents image assessments and public standard references separately: ISO 4628-3 Ri 0–Ri 5 for coating rust area image comparison, ISO 9223 C1–CX for atmospheric corrosivity environment classification, and ISO 8501-1 for original rust and surface cleanliness of unpainted steel. AI results are auxiliary; on-site engineering conditions and applicable specifications must still be confirmed together.
Platform reports can be used for inspection, maintenance tracking, and internal communication, but they do not automatically replace formal documents required for statutory inspections, third-party verification, or contracts. If a project requires evidence for acceptance, auditing, or regulatory compliance, we recommend confirming the required inspection methods, certification qualifications, and document formats before implementation.
The platform helps establish multi-year records of images, locations, assets, and assessments, serving as a data foundation for maritime or coastal facility inspections. Actual inspection cycles, classification society regulations, and authority requirements must still be confirmed by the owner or a qualified unit; the system can adjust fields and report formats according to project needs.
We recommend defining specifications based on verifiable needs and outcomes—such as image records, risk prioritization, data export, permission control, traceability, and acceptance indicators—rather than specifying a single brand or model. Bidding and procurement documents should still be handled according to applicable laws, bidding rules, and the procedures of the organizing unit.
General inspections can use mobile phones or existing cameras to upload photos; drones or existing photography equipment can also be integrated for high-altitude, wide-area, or hazardous areas as needed. We recommend building on existing inspection forms and photography standards, arranging brief instructions for photography, naming, and review processes to reduce the burden of on-site implementation.
Preliminary results for a single image analysis can be obtained immediately after upload. Processing times for batches, professional reports, or cases requiring human review vary depending on the number of images, network status, report requirements, and project workflows. We recommend starting with a small-scale pilot and integrating shooting, uploading, reviewing, and decision-making nodes into existing workflows.
Photos can be taken first following established naming and location rules, and then uploaded collectively once back in a stable network environment. If a project requires offline collection, intranet deployment, or edge device workflows, these should be explicitly proposed during the planning phase so the team can evaluate a suitable architecture based on on-site security and network constraints.
The platform provides structured photos, assessment results, risks, and report data. The actual integration with existing ERP, EAM, CMMS, or document management systems depends on fields, permissions, data formats, and API/export requirements. We recommend first defining the asset numbers, work orders, locations, and maintenance statuses to be exchanged.
The platform prompts users about image quality or usability risks during the upload and assessment process; users can retake photos, crop to focus on target areas, or supplement with photos from different angles. When quality is insufficient, the view is obstructed, or identification is impossible, low-confidence results should not be forced as a basis for engineering decisions.
Images and analysis records are managed according to the platform's storage, permission, and project settings. Generally, users should only be able to access their own or authorized data; enterprise projects can plan access scopes by organization, asset, or role. We recommend confirming data storage locations, retention periods, and personnel permissions before going live.
Any arrangement to use customer data for model improvement, labeling, or retraining must be predicated on explicit authorization, data de-identification, and contractual agreement. Unauthorized project data should not be used for training; if there is a model improvement plan, the scope of data, purpose, retention period, and opt-out mechanism should be confirmed first.
The rights, preservation, and deletion mechanisms for images and project data are governed by the terms of service and individual contracts. We recommend clearly agreeing on data ownership, export methods, retention periods, deletion application procedures, and backup handling principles before implementation, so that handover or clearing can follow established procedures when the collaboration ends.
Security and privacy requirements should be confirmed jointly based on data type, deployment architecture, location, and customer specifications. Platform design should include transmission and access protection, least privilege, operation logs, and data protection measures; if there are specific standards, internal rules, or auditing requirements, we recommend conducting a security requirement inventory before the project starts.
General usage can be arranged based on points and actual functional usage; needs such as batches, reports, integration, enterprise permissions, and project implementation may use different plans or project quotes. Users can first evaluate based on the required analysis volume and report needs, and then confirm the appropriate method through the platform page or the implementation contact.
You can start with a small number of photos or a single asset to confirm whether the photography process, assessment presentation, and report format meet the team's needs. The website provides a trial quota for visitors; for enterprise implementation, we recommend defining verification cases and success indicators before expanding to routine inspections.
Benefits can be measured by indicators such as inspection coverage, data archiving time, review man-hours, timing of defect discovery, rework or emergency repair events, maintenance prioritization, and cross-period trend tracking. Enterprise projects can establish baseline values and verifiable KPIs during the PoC phase.
Report covers, asset fields, photo layouts, assessment summaries, risk classifications, maintenance recommendations, and export formats can be discussed based on project needs. When involving acceptance, auditing, or data exchange with existing systems, we recommend providing examples and field definitions before implementation.
Common applications include steel structures, bridges, storage tanks, pipelines, ports and maritime facilities, offshore wind power surroundings, and various industrial equipment. Image characteristics may differ for different materials, coatings, lighting, and sites; actual photos will be confirmed for suitability before implementation rather than claiming all scenarios are applicable.
Yes. we recommend establishing contact windows, problem triage, and response scopes during implementation, including operation, data organization, report formats, and system integration. Questions involving on-site structural safety, regulations, or professional certification should still be handled by qualified professionals.
It is suitable to start with a single piece of equipment, a single inspection route, or periodic photography tasks to first establish image, asset, and maintenance records, and then gradually expand based on actual benefits. Small teams can use the web version for quick uploading and analysis without needing to implement a full enterprise system at once.
This section prepares evidence, procedures and review items only; it is not certification, legal advice, design, construction or a structural-safety conclusion.
Start with the AI analysis workflow. Enterprise integration requirements can be confirmed during project consultation.